Post-renovation cleaning is quoted from scope, not from hours, because the work is dominated by fine dust and residue rather than floor area. As a guide, a 1,000 sq ft unit after a light renovation (paint and flooring) usually needs two cleaners for five to seven hours; a full renovation with new cabinetry, cement film on tiles and paint spots throughout needs two visits. Send photos and you get a fixed figure.
Key facts
- Pricing basis
- Scope, not hours
- Typical team
- 2 cleaners, one or two visits
- Drives cost
- Cement film, paint spots, dust in cabinets
- Included
- Debris removal, detail dusting, final polish
Why it cannot be priced per hour
Renovation dust is not everyday dust. It is a mix of gypsum, cement, sanding residue and paint flecks, and it settles on every horizontal surface, including the insides of new cabinets and the tops of doors. A room that takes ten minutes to clean normally can take forty after renovation. The amount of dust is not proportional to floor area, which is why a per-hour quote either overcharges a light job or bankrupts the team on a heavy one.
What a full post-renovation clean includes
- Removal of large debris, packaging, offcuts and protective film.
- Vacuuming of all surfaces including cabinet interiors, then wiping, because dust sticks to wet wipes if it is not removed dry first.
- Removal of paint spots from tiles, glass and floors, and cement film from tiles using the correct acid-free agents for the tile type.
- Sticker and adhesive residue from new glass, sanitary ware and appliances.
- Wet areas descaled and grout scrubbed; silicone inspected.
- Final polish of glass, mirrors, taps and floors.
What raises the cost
Cement film on large tile areas is the single biggest factor, followed by the number of new windows and glass panels, the number of cabinets with interiors to clean, and whether the renovation included plastering or skim coating, which produces far more fine dust than painting alone. If the contractor has not removed their own debris, that is normally a separate arrangement and should be agreed before the visit.
Sequencing that saves money
Book the clean after all trades have left and all fixtures are installed. Cleaning between the painter and the electrician means doing the dust work twice. If furniture is arriving the same week, ask for the clean the day before delivery so nothing has to be moved twice. Our post-renovation cleaning service page explains the process step by step.